by Shane Henson — March 16, 2012—Borrego Solar Systems Inc., a San Diego-based designer, installer and financier of grid-tied government solar photovoltaic (PV) systems nationwide, recently announced the completion of a 3.4 megawatt (MW) solar power installation at Edwards Air Force Base in Southern California. Comprised of three ground-mounted, single-axis tracking solar farms, the system is the largest military project completed by Borrego Solar to date, and demonstrates the value of the company’s end-to-end solar power installation services for military facilities.
The route used to make the solar power installation possible is one that military facilities managers who are interested in utilizing solar power may want to consider.
The system was financed via Borrego Solar’s in-house Power Purchase Agreement (PPA). Per the agreement, Borrego Solar financed, designed and installed the system at no upfront cost to Edwards Air Force Base. Borrego Solar will sell energy back to Edwards Air Force Base at an economical and fixed rate, offsetting an average of six percent of the energy consumption across the three facilities.
“We are proud to have completed this project as it is a great example of how public-private partnerships can succeed and allow the development and installation of large-scale solar energy systems on government property,” said Mike Hall, CEO of Borrego Solar. “Edwards Air Force Base should be applauded for making renewable energy a priority at their facility. We look forward to continuing our work with military facility managers to help them take full advantage of the financial benefits that come from using solar to generate clean and sustainable energy, and local jobs.”